- March 27, 2024
- Posted by: admin
- Category: Kumasi
No Comments
In Prempeh II Link, Kumasi, power outages have been a recurrent issue over the past month, occurring more than four times per week and typically lasting between 3 to 6 hours. These outages predominantly happen in the evening, from 6:00 PM to 12:00 AM. I believe that “Dumsor” has resurfaced in Ghana. Dumsor table is needed at this time.